Tiling the Bathroom Walls
Yesterday I told you about the new bathroom doors. Â The door and trim had to be installed before I could finish laying the tile in the bathroom. Â Well, this week, with professional contractors help, I finished the Ceramic tile installation
And grouted it!
AND tiled and grouted the bathroom floor!
I’m still waiting on some window trim before I can finish up the wall behind the toilet.
But while I’m waiting, I have the whole shower to do. It’ll be a big effort to get that finished up but once it’s done, I can have someone out to measure for a shower enclosure. We’re getting so close to having a real bathroom! Eeek!
Sarah
sheila zimmermann
8/2/2013 | 2:27 pm Permalink
It looks super. What an accomplishment. The end is in site.